Work Performed, August 14th to 18th   
·         Started final testing of water main
·         Made repairs to water main identified during testing
·         Adjust manholes prior to final grade
·         Excavate, grade, and install topsoil in landscape area
·         Internally televising underground storm and sanitary sewers
·         General site clean-up.

Work Anticipated to be Performed, August 21st to August 25th  
·         Complete final testing of water main
·         Complete excavation, grading, and installation of topsoil in landscape areas
·         Pave final layer of asphalt

The contractor will continue to install and grade topsoil; however, sod will not be installed until mid-September when the growing conditions are typically more favorable.

Hopefully a majority of the construction work, with the exception of sod installation, will be completed in the next 1-2 weeks.