Paved final surface layer of asphalt
·
Performed final testing of water main system
Work to be Performed
·
Asphalt driveway restoration
·
Pavement patching near Wagner Road
·
Minor repairs indentified outside the pavement
·
Final inspection with Village staff prior to
project close-out.
·
Sod Restoration, to be performed in
mid-September when growing conditions are typically more favorable.